CLASSROOM BUILDING, SCHWIELOWSEE
To reduce the total area of the building segment under design, the previously necessary foyer on the ground floor and the upper floor above it were demolished. This alteration visually separated the complex into two independent buildings. The space between these two structures was developed into a terrace with landscaping. A newly created central access axis provides direct connectivity to various functional areas, including the large lecture hall, the battalion lecture rooms, and the changing rooms.
Service
Feasibility study / Preliminary planning / Design and execution planningPeriod
2011-2014Location
Werderscher Damm, SchwielowseeClient
Brandenburgischer Landesbetrieb für Liegenschaften und Bauen, Niederlassung PotsdamTeam B+
- Anuschah Behzadi
- Ralph Mallach
- Eva Naumann
- Alexander Haluany
- Petra Rösner