BUILDING 24, GOK, COMPLETE RENOVATION, LEIPZIG
As part of the planned renovation of Building 24 at the General-Olbricht Barracks in Leipzig, the building will undergo fire protection and energy-saving upgrades in two construction phases. The planned measures include the auditorium area, including the directly adjacent entrance zone, the gymnasium area, and the associated social and changing facilities. Notably, the roof space of the large auditorium will undergo significant changes, including a complete opening, in conjunction with the removal of fire loads.